On the basis of the in-depth investigation into the quality common fault in pointing of the cement-rubble project on the reaches of Zhang river,the author analyzes the cause of the cavitating of the pointing,and brings forward some approaches to prevent the quality defect and improve the quality of the cement-rubble.
通过对漳河上游浆砌石工程勾缝质量问题的深入调查,分析了勾缝空鼓的原因,并有针对性地提出了防治措施。
本站部份资料来自网络或由网友提供,如有问题请速与我们联系,我们将立即处理!
Copyright © 2013-2024 杭州优配网络科技有限公司 All Rights Reserved 浙ICP备20019715号
免责声明:本站非营利性站点,以方便网友为主,仅供学习。合作/投诉联系QQ:1553292129