critical path method

基本解释运筹法

网络释义

1)critical path method,运筹法2)operation research method,运筹方法3)operation,运筹4)operations research problems / pansystems methodology,运筹问题/泛系方法论5)operational research,运筹学6)operation research,运筹学

用法和例句

Deeply cognition and comprehensive operation on successful management of Longan orchard;

龙眼园成功经营的深入认识和综合运筹

Effect of different fertilizer operations on yield of winter wheat Han-6172;

不同施肥运筹对冬小麦邯6172产量的影响

The application of operational research in building construction;

运筹学在建筑施工中的应用

The application of model construction software-LINGO in operational research;

优化建模软件LINGO在运筹学中的应用

Introducing "collaborative learning" into the teaching of operational research;

将“合作式学习”引入运筹学的教学

Some ideas on offering public optional course——Operation Research course;

关于高校开设公共选修课——“运筹学”的一些想法

The Function of the Maths Teachers Operation Research Diathesisin Voc-Tech College of Communications;

运筹学素养对交通类高职数学教师的作用

With the help of operation research and management science,the performance of such a system will be greatly improved.

通过分析排队论及其组成部分、性能指标和模型,分析火车站客运售票系统的等待问题,并从运筹学和管理科学的角度来优化系统,使其服务质量和效率达到最高。

Causal Relations Analysis of Economic Systems and Operations Research

经济系统的因果关系分析与运筹方法

The Analysis for Force Deployment for in Antiterrorism Action;

反恐兵力分配运筹方法辅助决策研究

The Research on the Method of Finance and the Mechanism of Operating of Annuity in China;

中国养老金筹集方法与运营机制研究

Discussion on the Application of Operational Research Method in Value Engineering;

运筹学方法在价值工程中应用的探讨

Study of Teaching Method in MBA s 《Operations Research》;

MBA《管理运筹学》案例教学方法探讨

Discussion on Operations Research Curriculum Experimental Teaching Method

“运筹学”课程实验教学方法的探讨

Theories and Methodologies of RMS System Level Design Based on Operational Research;

基于运筹学的RMS系统级设计理论与方法

Study of Operation Research Problems and Methods in Logistics Distribution;

物流配送系统中的运筹学问题及方法研究

Methods and using about the large-scale mining industry company s tax planning;

关于大型矿业公司的税务筹划的方法及运用

Applying selected Accounting Approach onto Taxes Planning;

论会计处理方法的选择在纳税筹划中的运用

Study on Application of Operational Research Method on Bidding Strategy of Generation Companies;

运筹学方法在发电企业竞价策略中的应用研究

Research on the Independence Teaching Method of the Course of Operational Research for Management Specialty

管理类专业运筹学课程“自主性”教学方法探索

The thesis uses 0-1 integer linear programming to construct algorithm-hardware mapping models.

论文运用运筹学中的0-1整数规划方法建立算法-硬件映射模型。

Innovation Teaching Method,Raise Teaching Quality--"Management Operation Research" Teaching Method Talk;

创新教学方法 提高教学质量——管理运筹学教学方法谈

At the end of this paper, potential OR techniques are developed in terms of future applicability.

文中还就运筹学方法今后的应用发展潜力作了探讨。

This paper investigates the possible uses of operations research( OR) models and its techniques in industrial engineering( IE).

调查研究了运筹学(R)模型及其方法在工业工程(E)应用情况。

Financing and Allocation of HIV/AIDS Resources in China by National Health Accounts (NHA);

运用NHA方法分析我国艾滋病防治经费的筹集与分配

Socrates Pedagogy in Classroom Teaching of Operational Research;

苏格拉底教学方法在课堂中的应用——《运筹学》课堂教学改革试验

最新行业英语

词汇分类
高中词汇CET4词汇CET6词汇TOEFL词汇IELTS词汇GRE词汇考研词汇
首字母索引
ABCDEFGHIJKLMNOPQRSTUVWXYZ

本站部份资料来自网络或由网友提供,如有问题请速与我们联系,我们将立即处理!

Copyright © 2013-2024 杭州优配网络科技有限公司 All Rights Reserved 浙ICP备20019715号

免责声明:本站非营利性站点,以方便网友为主,仅供学习。合作/投诉联系QQ:1553292129