Discussion on steam and water two-phase flow self-adjustable water level controller of No.1unit 330MW high-pressure heater in Zhongning Power;
浅谈中宁电厂~#1机组330MW高加汽液两相流自调节水位控制器
Analysis of scald accident in repairing unite-valve of high-pressure heater;
高加联成阀检修烫伤事故分析
it analysed unstable cause of high pressure heater and provide with effective improving measure.
以韶关发电厂8号机组汽轮机为例,对高加水位运行不稳定原因进行了分析,并进行了有效的改进措施。
Through the statistic analysis for 2 years operation condition of 2 sets of 200MW unit high pressure heater in Wuhan steel and power Co.
通过对武汉钢电股份有限公司2台200MW机组2年来高压加热器运行状况的统计分析,找出影响高加投入率的主要原因,提出相应的技术改造和技术措施,大大提高了高加投入率。
Research on impact test mechanism for high acceleration ejection;
高加速度弹射物冲击试验装置研究
In the paper introduce the new experimental technology which use the high rotary testing machine to test the dynamic characteristic of micro-structure under the condition of high acceleration, the rigid connection technology, solid damping technology and dynamic balancing technology which are fit for high-acceleration experiment of solid mass is proposed, the high-accelerati.
利用高速旋转装置模拟高加速度运行环境,对其实验装置的研发具有重要的理论意义和实用价值。
The measurement of displacement and velocity are accomplished at high acceleration by optical fiber sensor.
利用光纤传感器实现了可在高加速度下物体平动位移和速度的测试,实验证明了该方法的有效性,对产生误差的原因进行了分析。
An analysis of the split Hopkinson pressure bar (SHPB) test at high loading rate is presented concerning the experimental data, the numerical simulation and the description of constitutive laws of specimen.
从实验、理论与数值模拟的结合上,对于高加载率的SHPB试验原理提出一种新理念。
本站部份资料来自网络或由网友提供,如有问题请速与我们联系,我们将立即处理!
Copyright © 2013-2024 杭州优配网络科技有限公司 All Rights Reserved 浙ICP备20019715号
免责声明:本站非营利性站点,以方便网友为主,仅供学习。合作/投诉联系QQ:1553292129